Project need and strategic options


Seven year statement - 2011 
Annually released document relating to the transmission system in Great Britain including details of demand, generation, plant margins, characteristics of the existing and planned national electricity network.
 
Offshore development information statement - 2011 
The aim of the Offshore Development Information Statement is to help facilitate the development, in offshore waters, of an efficient, coordinated and economical system of electricity transmission.

Need Case for the East Anglia Region - November 2013
Explains the need to increase the capacity of the East Anglian electricity transmission system

Need Case for the East Anglia Region - June 2011 (now superceded)
Explains the need to increase the capacity of the East Anglian electricity transmission system

Review of Strategic Options Report - June 2011
Reviews the strategic options set out in the Strategic Optioneering Report 2009 in light of further information and representations to consultation.

Route Corridor Study - October 2009 
Published in 2009, this study, which includes an Ornithological Report, describes the identified route corridors for the connection between Bramford substation in Suffolk and Twinstead Tee in Essex, which formed the basis for the Stage 1 Consultation.

Strategic Optioneering Report - October 2009
Examination of technically feasible connection options.